Laserfiche WebLink
S WRCB, January 2002 t ��-G`� Page of <br /> 4, SPILUOVERFILL CONTAINWNT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested 0 <br /> Test Method Developed By: 0 Spill Bucket Manufacturer Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum ydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> 2 - <br /> ° <br /> Spill Box# Spill Box# Spill Boz# Spr71 Boz# <br /> Bucket Diameter. IZ`` !Z =® i2- <br /> Bucket Dep& 2." <br /> Wait time between appl`ing <br /> pressure/vacimm/water and O yn"t /,0 44, "k <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): 7 <br /> Test End Time: Ile, 3d ✓d d �'1�c <br /> Final Reading( ) � ,,e e <br /> Test on: <br /> Change in Reading(RF-Ri)= <br /> Pass/Fail Threshold or <br /> Crit <br /> Test Resalt: ass 0 Fail Pass 0 Fail Pas.. 0 Fail 0 Pass ❑Fail <br /> Comments— (include information'on repairs made prior to testing, and recommended-jollow-up for failed tests) <br />