My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2300 - Underground Storage Tank Program
>
PR0231401
>
COMPLIANCE INFO_1988-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:48:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2004
RECORD_ID
PR0231401
PE
2361
FACILITY_ID
FA0006388
FACILITY_NAME
KWIK SERVE
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
01
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231401_950 W ELEVENTH_1988-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
566
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING AND RESPONSE PLAN <br />UNDERGROUND STORAGE TANS: MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit. The permit }colder trust notify Environmental Health Department, (209).468-3420 <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or a permit before malting <br />the change. Required by CCR 2632 (d) and 2641 (h). <br />FACILITY NAME <br />Gu v, <br />DATE 6,57-7 1 ?-'0-3 <br />FACILITY ADDRESS <br />r7 <br />1.Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />cc1 e � — C- AJ ri <br />2.Describe the frequency of performing the monitoring for. <br />TADS PIPING% G(i <br />3.Describe the location(s) of where the monitoring will be performed i Zlocation <br />yoef se rs I <br />4.Describe the following 9quipment for <br />Name and Model of Monitoring Panel <br />Name and Model of Line Leak Detectors <br />Name and Model of Annular Sensors <br />Nance and Model of Piping Sensors <br />Name and Model of Dispens�nsors <br />Type of overfill prevention <br />ch underground storage tank. <br />�p <br />e v- <br />r7 <br />7 1 If ;L 0 <br />V.e Ae"I <br />fit.,C-R <br />V ` "i. <br />y""7- 5 -: s"a <br />/-a s -�'�`, Ir IC <br />Jaw A) <br />S.Do the Turbine Sensors'and Dispenser Pan Sensors shut down the turbine? Yes No 0 <br />Does the turbine shut down if a sensor is disconnected? Yeses No 0 <br />Does the turbine shut down is the monitoring panel loses power? Yeses No 0 <br />6.. How will the alarm history and subsequent maintenance be recorded? <br />7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br />annual monitoring certification be performed in? S - -Z'6- 0 <br />es /V 1^✓� et t>L /ttjj a� /� d d <br />Note: For new installations the secondary containment must be tested 6 months after installation. All secondary containment systems <br />must be tested once every 36 months with initial testing performed before January 1, 2003. <br />8. Describe the training necessary for the operation <br />equipment. A ,, n) 7-- 1t - Q u c 2- ,-t L l <br />1:Wnit ni\UST monitorinsplan.doc <br />4/2/2003 <br />system, including piping, and the Monitoring <br />Cry r ii�.e e ai Q v�a c <br />
The URL can be used to link to this page
Your browser does not support the video tag.