My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2300 - Underground Storage Tank Program
>
PR0231401
>
COMPLIANCE INFO_1988-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:48:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2004
RECORD_ID
PR0231401
PE
2361
FACILITY_ID
FA0006388
FACILITY_NAME
KWIK SERVE
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
01
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231401_950 W ELEVENTH_1988-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
566
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM DRAWING INFORMATION <br />TANK # <br /># <br /># 2 # �? <br />1. <br />�" <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />I O c-10 <br />__> <br />2. <br />MANUFACTURER <br />Plans drawn to scale in non -erasable print. <br />3. <br />4. <br />X, <br />Plot plan to show location of tanks and all associated piping. <br />Striker plates or drop tube -mounted bo tom protectors illustrated below all accessible openings__-i,S�%��} <br />5. <br />XTank <br />cross-sectional diagram. <br />� <br />6. <br />Y% <br />Detail of tank, associated piping, excavation and cover. �t( <br />7. <br />PRODUCT <br />Tank(s) and piping approved by a nationally recognized independent testing organization. (Title 23, Chapter 16, <br />Article 3, Section 2631 (b) & 26351 C'x /f ) 1 <br />CORROSION PROTECTION <br />r <br />8. <br />Verification of product compatibility with the tank(s), piping, monitoring <br />Y <br />�ievice(s), epoxy or silicone glues, etc. �X1✓1r, <br />9. <br />Manufacturer's written installation instructions for tank(s), piping, nitoring devices, <br />etc. <br />10. <br />A <br />At the installation site, prior to installation, a tightness test shall be performed on h primary (10) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)3Xe� <br />11. <br />%X/ <br />Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, 25291 (h)] <br />17 <br />TANK rnYPnCTTTnY <br />�S-e^ction <br />C-' , `4— <br />TANK # <br /># <br /># 2 # �? <br /># <br /># <br />CAPACITY <br />I O c-10 <br />__> <br />MANUFACTURER <br />! 1J L4 <br />COMPOSITION <br />W <br />L1 <br />MODEL <br />PRODUCT <br />CORROSION PROTECTION <br />r <br />U.L. LISTED <br />Y <br />COMPTIBILITY WITH 100% <br />METHANOL <br />13. TANK(s) TO BE INSTALLED 40 <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />_ (2) Vacuum applied to interstitial space. <br />B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non-ctad steel tank [Section 2635 (a) (2) (A)3 <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.