My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2300 - Underground Storage Tank Program
>
PR0231401
>
COMPLIANCE INFO_1988-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:48:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2004
RECORD_ID
PR0231401
PE
2361
FACILITY_ID
FA0006388
FACILITY_NAME
KWIK SERVE
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
01
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231401_950 W ELEVENTH_1988-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
566
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPTION 2A <br />ARTICLE 3, SECTION 2633/2634 <br />MOTOR VEHICLE FUELS ONLY <br />CONSTRUCTION <br />1. Requirements: <br />A. Approved tank construction material <br />B. Leak interception and detection system which complies with Article 3, <br />Section 2631(c). <br />C. Membrane liners must comply with Article 3, Section 2633(e), (1), (2), <br />(3), (4),(_5) and are only allowed for piping systems (Department Policy) <br />D. Demonstrate that the leak interception and detection systems protects <br />round water from contamination (Article 3, Section 2633(f), (1), (2), (3), <br />�4), (5), (6), (7). <br />E. Pressurized piping systems must be installed with a leak detector that is <br />capable of automatically shutting off the product pumps. <br />1. Any single wall component "tank or piping" requires daily inventory <br />re,concilliation and annual precision tests as part of the monitoring <br />program. <br />F. Before covering, the tank(s) and system(s) must be tested to NFPA 30, <br />Standards. <br />G. Before use - the tank(s) and system(s) must be tested in accordance to <br />NFPA 329. <br />H. Provide soil profile of vadose zone if membrane liners are used. <br />ARTICLE 3, SECTION 2634 <br />MOTOR VEHICLE FUELS ONLY <br />MONTTnRTNG <br />1. Requirements (leak interception and detection system(s)). <br />A. Floor must be constructed on a firm base and sloped to a collection sump. <br />B. Access casings must be installed in accordance to Article 3, Section <br />2634 (c) 0 thru 6), (d) (1). <br />C. Submit written monitoring and response plan as stated in Article 3, <br />Section 2634 (d) (1-3), 2634(e) (1-5). <br />D. Hard wiring of electronic monitoring systems is required. <br />E. Provide manufacturer's written installation instructions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.