Laserfiche WebLink
l-4,0 P"� ` qlsv <br />April 21, 1988 <br />S ao-Pin Yo, Ph.D. usae Yang -- Date <br />Manager, Organic Group Chemist <br />ETHYLENE <br />DIBROMIDEE( DB) <br />METHOD GC ECD <br />EUREKA LABORATORIES, INC. <br />Order No.: W8804 <br />3401 La Grande Blvd. <br />Hazardous Waste Testing <br />Sacramento, CA 95823 <br />Certification: 108 <br />(916) 428-1193 <br />CLIENT: WALTON ENGINEERING <br />PROJECT NO.: 88-2104 <br />RECEIVED DATE: 4/19/1988 <br />COMP. DATE: 4/21/1988 <br />SAMPLE LOCATION: - <br />ELI NO. SAMPLE ID. <br />EDB CONTENT jjjK 12Rb 1 <br />W63103 88-2104-1 <br /><1.0 <br />under reg, <br />tank <br />W63106 88-2104-A <br /><1.0 <br />exc. soil <br />front pile <br />W63107 88-2104-B <br /><1.0 <br />exc. soil <br />back pile <br />W63108 88-2104-C <br /><1.0 <br />Tracy San <br />Joaquin Land <br />Fill surface composite <br />two piles <br />soil <br />Method Blank <br /><1.0 <br />Reagent Spike Recovery <br />115% <br />Reagent Spike Recovery duplicate <br />1025 <br />Detection Limit <br />1.0 ug/Kg (ppb) <br />l-4,0 P"� ` qlsv <br />April 21, 1988 <br />S ao-Pin Yo, Ph.D. usae Yang -- Date <br />Manager, Organic Group Chemist <br />