Laserfiche WebLink
09/2212010 16:39 209-465-4988 HMC HENDERSON MAINT PAGE 03/03 <br /> 0 <br /> PLLD Transducer Installation Red Jacket Standard and Quantum Pumps(PLLD w/PressurstaO <br /> =UICkettandard d Quantum Pumps rPLLD W/ urstat) {:., <br /> u _ <br /> Use this installation procedure to install a PLLD transducer in a Red Jacket Standard or Quantum pump that has a <br /> Pressurstat that will be used for leak detection.NOTE:This installation method cannot be used if there is a Stage <br /> 11 vapor recovery device installed in the pressurized piping. <br /> 1. Switch Off,tag,and lockout all AG power to the TLS console,dispensers and submersible pumps. <br /> 2. If a ball valve is installed down line from the pump,close it. <br /> 3. Do one of the following: <br /> a. If the submersible turbine pump is equipped with a mechanical LLD,remove the mechanical unit and any <br /> related tubing and fittings,or <br /> b. If the submersible turbine pump is not equipped with a mechanical LLD,remove the 2-inch mechanical <br /> LLD port plug. <br /> 4. Thread the PLLD transducer into the LLD port(Figure 5). <br /> IMPORTANT!Seal any pipe threads using a.UL-classified,nontoxic pipe sealant suitable for the fuel involved. <br /> PreSsurStat <br /> (adjustable �, ----- PLLD transducer <br /> functional <br /> element) <br /> m <br /> e <br /> t <br /> Figure Z PLLD/Pressurstat installation <br /> 5. Get a watertight cord grip from the transducer installation kit and coat its 1/2" NPT threaded end with UL- <br /> classified,nontoxic pipe sealant suitable for the fuel involved.Screw the cord grip into one of the openings in <br /> the weatherproof junction box.Feed the end of the PLLD transducer cable through the cord grip and then <br /> tighten the nut to ensure a watertight seal.Connect and seal the pressure transducer wires to the wires from <br /> the TLS console as described in'Epoxy Sealing PLLD Transducer Field Wiring Connections'on page 21. <br /> 6. Open the ball valve down line from the pump. <br /> 13 <br />