My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2300 - Underground Storage Tank Program
>
PR0231401
>
COMPLIANCE INFO_2005-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:48:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2012
RECORD_ID
PR0231401
PE
2361
FACILITY_ID
FA0006388
FACILITY_NAME
KWIK SERVE
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
01
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231401_950 W ELEVENTH_2005-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/10/2010 07:29 209-465-4988 HMC HENDERSON MAINT PAGE 03/03 <br /> Troubleshooting Guidelines Setup Data Warning <br /> 4. Active Continuous Pump warning/alarm or Continuous Handle alarm. <br /> 5. If the site is extremely busy,especially if blenders are present,there may not be sufficient idle time to complete <br /> a Periodic or Annual test unless the station is shut down. <br /> 6. Dispenser programmed to turn On all pumps when only one product is to be used. <br /> 7. Test was not scheduled. <br /> Setup Daft Warning <br /> This alarm occurs if an error was made in programming.This alarm will also occur if the line length has not been <br /> programmed.The line length default is 501 feet and will cause a SETUP DATA WARNING if the Service <br /> Contractor does not enter the line length. <br /> IMPORTANTI The default line type is set to FLEX A(white Enviroflex PP1501).If the actual line type is not FLEX <br /> A,and the Service Contractor does not select the correct line type,the result may be a line test failure. <br /> Troubleshooting Field Leak Testing Problems <br /> This procedure is for sites,which when tested per Veeder-Root documents,fail to produce shutdowns when a <br /> calibrated leak is applied to the line. <br /> The following steps are necessary to identify the cause of the failure.It is necessary to retest after each step. <br /> 1. Verify that the console has been programmed to shut down on 3 gph line test failures. <br /> 2. Verify that the pump relay is not sticking,causing the STP to stay On when the console is trying to shut it <br /> down. <br /> 3. Verify that the PLLD/WPLLD transducer is measuring within 5 psi of actual line pressure.Replace transducer <br /> if necessary, purge the line of air,and perform 3 gph test. <br /> 4. Verify that the seating pressure of the check valve is between 17-25 psi.If the check valve seating pressure is <br /> outside of this range, replace it and purge the line of air. <br /> 5. Remove and replace the siphon jet assembly from the FE Petro pump(P/N 400562901).This device <br /> eliminates air from getting into the piping system.If air enters the piping system,it affects the bulk modulus of <br /> the line and will shift leak thresholds.If a defective jet assembly is found,it is necessary to fully purge the line. <br /> 6. If the console has software version 16/116/316 or lower,upgrade the software to the current version. <br /> 40 7. In the console line leak setup,increase the piping length by 10 percent and retest the line.If the line passes, <br /> the length of piping had been underestimated and should remain at the new length. <br /> 8. if the console has software version 23 or higher and is in the"User Defined"mode,verify that the Bulk <br /> Modulus value for the line being tested is programmed correctly. Refer to the Line Leak Application Guide(P/ <br /> N 577013-465)for approved Bulk Modulus values. <br /> 9. If the line fails to produce shutdowns after these steps have been followed,contact Veeder-Root Technical <br /> Support for further assistance. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.