Laserfiche WebLink
• <br />• <br />MONITORING SYSTEM CERTIFICATIONrmll <br />��� <br />For Use By All Jurisdictions Within the State of California a.,�, <br />Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be <br />prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to <br />the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems <br />within 30 days of test date. <br />A. General Information <br />Facility Name: Kwik Serve Bldg. No.: <br />Site Address: 950 W. 11th Street City: Tracy, CA Zip: 95376 <br />Facility Contact Person: Patel Contact Phone No.: (209) 832-1810 <br />Make/Model of Monitoring System: VR TLS 350 Date of Testing/Servicing: 10/30/08 <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicate specific equipment inspected/serviced: <br />Tank ID: T-1 Diesel <br />Tank ID: T-3 87 <br />O In -Tank Gauging Probe. <br />Model: MAG -1 <br />0 In -Tank Gauging Probe. <br />Model: MAG -1 <br />❑x Annular Space or Vault Sensor. <br />Model: 794390-407 <br />D Annular Space or Vault Sensor. <br />Model: 794390-407 <br />O Piping Sump / Trench Sensor(s). <br />Model: 794390-208 <br />❑x Piping Sump / Trench Sensor(s). <br />Model: 794390-208 <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑x Electronic Line Leak Detector. <br />Model: VR PLLD <br />I] Electronic Line Leak Detector. <br />Model: VR PLLD <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other s eci equipment and model in Section E on Pae 2). <br />❑ Other(specify equipment t and model in Section E on P e 2). <br />Tank ID: T-2 91 <br />Tank ID: <br />❑x In -Tank Gauging Probe. <br />Model: MAG -1 <br />❑ In -Tank Gauging Probe. <br />Model: <br />❑x Annular Space or Vault Sensor. <br />Model: 794390-407 <br />❑ Annular Space or Vault Sensor. <br />Model: <br />❑x Piping Sump / Trench Sensor(s). <br />Model: 794390-208 <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />O Electronic Line Leak Detector. <br />Model: VR PLLD <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other(specify equipment a and model in Section E on P e 2 . <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />Dispenser ID: 1-2 <br />Dispenser ID: 7-8 <br />❑O Dispenser Containment Sensor(s). <br />Model: 208 <br />El Dispenser Containment Sensor(s). <br />Model: 208 <br />O Shear Valve(s). <br />El Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dis nser Containment Floats and Chain(s). <br />Dispenser ID: 3-4 <br />Dispenser ID: <br />❑X Dispenser Containment Sensor(s). <br />Model: 208 <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />❑X Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />I ❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: 5-6 <br />Dispenser ID: <br />O Dispenser Containment Sensor(s). <br />Model: 208 <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />Fxl Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />'If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this <br />information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such <br />reports, I have also attached a copy of the report; (check all that apply): ❑ System set-up ❑ Alarm history report <br />Technician Name (print): Alvin L. Milburn Signature: <br />Certification No.: A27843 <br />Testing Company Name: EPIC Compliance Systems, Inc. <br />Testing Company Address: 2400 San Bruno Ave, San Francisco, CA <br />UN -036 - 1/4 <br />Page I of 4 <br />www.unidoes.org <br />License. No.: 880430 <br />Phone No.: 888 -777 -EPIC <br />Date of Testing/Servicing: 10/30/08 <br />Rev. 06/04/01 <br />