Laserfiche WebLink
~ dQrED PROGRAM CONSOLIDATED FO O 5 q o <br /> TANKS <br /> UNDERGROUND STORAGE TANKS-TANK PAGE 2 <br /> Pae of <br /> VL PIPING CONSTRUCTION(t .k..11 hatwA,) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE 1.PRESSURE ❑2.SUCTION [13-GRAVITY 458- ❑I.PRESSURE ❑2.SUCTION 03-GRAVITY 459. <br /> CONSTRUCTION/ ❑1.SINGLE WALL ❑3.LIED TRENCH ❑99-OTHER 460. ❑L SINGLE WALL ❑95.UNKNOWN 462. <br /> MANUFACTURER a 2.DOUBLE WALT. ❑95.UNKNOWN ❑?DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER 461. MANUFACTURER 463. <br /> ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL ❑L BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL <br /> [13.PLASTIC COMPATIBLE WITH CONTENTS ❑95.UNKNOWN ❑3.PLASTIC COMPATIBLE W/CONTENTS 118.FLEJQBLE(HDPE) ❑99.OTHER <br /> 4.FIBERGLASS [18.FLE)aBLE(HDPE) ❑99.OTHER 1 ❑4.FIBERGLASS ❑9.CATHODIC PROTECTION <br /> 465. <br /> ❑5-STEEL W/COATING ❑9.CATHODIC PROTECTION 464- ❑5-STEEL W/COATING ❑95 UNKNOWN <br /> VIL PIPING LEAK DETECTION(rl«x all tmt apply)(A " 'on of8x mwomring progrwn shalt be suboutted to the local agemy.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466- SINGLE WALL PIPING 467 <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP ❑1. ELECTRONIC LBHE LEA DETECTOR 3.0 GPH TEST WITH AUTO PUMP w <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,A_ND SYSTEM DISCONNECTION SHUT OFF FOR LEAK,SYSTEM EM_AILURE,AND SYSTEM STEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> ❑2. MONTHLY 02 GPH TEST ❑2. MONTHLY 0.2 GPH TEST <br /> I <br /> [13. ANNUAL INTEGRITY TEST(0.1 GPH) ❑3. ANNUAL INTEGRITY TEST(0-1 GPI <br /> 04. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING C]5. DAILY VISUALMONTTORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): [16. TRIENNIAL INTEGRITY TEST(0.1 GPII) <br /> ❑7- SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW ❑7. SELF MONITORING <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> [18. DAII.Y VISUAL MONITORING <br /> ❑9. BIENNIALINTEGRTTYTEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARII.Y CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> a AUTO PUMP SHUT OFF WHEN A LEA OCCURS ❑a.AUTO PUMP SHUT OFF WHEN A LEA OCCURS <br /> b.AUTO PUMP SHUT OFF FOR LEAS,SYSTEM FAILURE AND SYSTEM X b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c. NO AUTO PUMP SHUT OFF ❑c. NO AUTO PUMP SHUT OFF <br /> 54 11. AUTOMATIC LINE LEAKDETECTOR(3.0 GPH TEST)WITH FLOW SHUT 11.AUTOMATIC LEA DETECTOR <br /> OFF OR RESTRICTION <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPIs ❑12.ANNUAL INTEGRITY TEST(0-1 GPI <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVTTY SYSTEM <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS pq 13-CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF [114. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> ❑15. AUTOMATIC LINE LEA DETECTOR (3.0 GPH TEST) WITH FLOW ❑15-AUTOMATIC LINE LEAKDETECTOR(3.o GpH TEST) <br /> SHUT OFF OR RESTRICTION <br /> ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DAILY VISUAL CHECK ❑17.DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTA114MENT 468. ❑1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4. DAILY VISUAL CHECK 469_ <br /> DATE INSTALLED J42. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5. TRENCH/LINER MONITORING <br /> r 3 3 <br /> [:13. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ❑6. NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> DL OWNER/OPERATOR SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> A OF O OP DATE: 470. <br /> C! O3 - � 9- 03 <br /> 472. <br /> NAME OF OWNER/OPERATOR(prim): TITLE OF OWNER/OPERATOR <br /> CA c � � a � CC /V r A T C) <br /> Permit Ntmmber(Agency use only) 473. Permit Approved By(Agency use only) 474_ Permit Expimon Date(Agency use only) 475. <br />