Laserfiche WebLink
04W& <br />Page 1 of c �-�Fj <br />Secondary Containment Testing Report Form�Nyly ,,Qi,,N�� �gwICES <br />PEF,m i I�- <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of <br />this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should <br />be provided to the facility owner/operator for submittal to the local regulatory agency. <br />FACILITY INFORMATION <br />Facility Name: Kwik Serve I Date of Testing: 05/02/08 <br />Facility Address: 950 W. 11th St., Tracy, CA 95376 <br />Facility Contact: Patel Phone: (209) 832-1810 <br />Date Local Agency Was Notified of Testing: <br />Name of Local Agency Inspector (if present during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: EPIC Compliance Systems, Inc. <br />Technician Conducting Test: Keith A. Huston #5262044 -UT <br />Credentials: 0 CSLB Licensed Contractor L SWRCB Licensed Tank Tester <br />License Type: A License Number: 880430 <br />Manufacturer Traininq <br />Manufacturer Component(s) Date Training Expires <br />3. SUMMARY OF TEST RESULTS <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Super Annular <br />o <br />Ll <br />Ll <br />J <br />7/8 UDC 0 <br />Ll <br />U <br />Ll <br />Regular Annular <br />o <br />Ll <br />Lj <br />J <br />J <br />0 <br />J <br />Ll <br />Diesel Annular <br />IF] <br />J <br />J <br />U <br />Lj <br />Li <br />Lj <br />Lj <br />Super Sec. Piping <br />o <br />J <br />J <br />L] <br />Ll <br />Ll <br />Ll <br />Ll <br />Regular Sec. Piping <br />o <br />Ll <br />L3 <br />Q <br />J <br />U <br />0 <br />LJ <br />Diesel Sec. Piping <br />0 <br />J <br />Lj <br />Ll <br />Ll <br />Ll <br />Ll <br />J <br />Regular Sump <br />0 <br />0 <br />Ll <br />J <br />Lj <br />Ll <br />Li <br />Ll <br />Super Sump <br />1E <br />Ll <br />Ll <br />J <br />j <br />Li <br />Lj <br />Lj <br />Diesel Sump <br />o <br />J <br />Lj <br />L3 <br />LJ <br />Lj <br />Ll <br />Ll <br />1/2 UDC <br />El <br />J <br />J <br />LJ <br />Ll <br />Lj <br />El <br />❑ <br />3/4 UDC <br />0 <br />❑ <br />U <br />❑ <br />❑ <br />❑ <br />❑ <br />D <br />5/6 UDC <br />IRI <br />J <br />L] <br />❑ <br />Ll <br />Ll <br />L3 <br />LI <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, thqJf4yts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: Date: 05/02/08 <br />