Laserfiche WebLink
• <br />Page 3 of 8 <br />5. SECONDARY PIPE TESTING <br />• <br />Test Method Developed By: <br />- Piping Manufacturer <br />0 Industry Standard <br />Other (Specify) <br />Professional Engineer <br />Test Method Used: <br />Z Pressure <br />- Vacuum <br />Other (Specify) <br />Hydrostatic <br />Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br />Piping Run # Super Piping Run # Regular Piping Run # Diesel Piping Run # <br />Piping Material: <br />FG <br />FG <br />FG <br />Piping Manufacturer: <br />UK <br />UK <br />UK <br />Piping Diameter: <br />3 1/2" <br />3 1/2" <br />3 1/2" <br />Length of Piping Run: <br />150' <br />150' <br />150' <br />Product Stored: <br />Gas <br />Gas <br />Diesel <br />Method and location of piping- <br />run isolation: <br />3/4 UDC <br />3/4 UDC <br />3/4 UDC <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />5 m i n <br />Test Start Time: <br />10:30 <br />10:30 <br />10:30 <br />Initial Reading (Ri): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />11:30 <br />11:30 <br />11:30 <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />1/2 hr <br />1/2 hr <br />1/2 hr <br />Change in Reading (RF-Ri): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />I] Pass 0 Fait 0 Pass ❑ Fail <br />IRI Pass 0 Fail <br />0.Pass0 Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />