Laserfiche WebLink
Dec 05 07 11:00a Elite Iv Contractors Inc 209461 42 P.1 <br />0 <br />2007 <br />�VVMONMEHT <br />FIERMI T/Slin W"(1111, <br />Drop Tube Calculation for 95% Shut Down <br />do <br />LIP"' <br />T=R+ 10%D <br />T is the top of drop tube to the flapper <br />R is the riser length <br />D is the diameter of the tank <br />T <br />