Laserfiche WebLink
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) TECHNICIAN: DAVE WINKLER <br /> Cert#0082 Exp. <br /> Site: KWIK SERVE Date: 8-17-11 Time: 12 <br /> Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL <br /> Grade (.15"Water) (.45" Water) (.95"Water) Grade (.15"Water) (.45"Water) (.95"Water) <br /> .60CFH .80CFH --- <br /> 1 ALL .21 .40 PASS --- <br /> 2 ALL .24 .39 PASS --- <br /> 3 ALL .22 .39 PASS --- <br /> 4 ALL .22 .38 PASS --- <br /> 5 ALL .21 .38 PASS --- <br /> 6 ALL .22 .38 PASS --- <br /> 7 ALL _ _.23 _ .39 PASS _ _ --- <br /> 8 ALL .23 .40 PASS --- <br /> LIQUID REMOVAL CHECK **See Long Form Test Report for Wet Failure Testing Blockage Tester Integrity: <br /> D=Dry ALL 8 DRY 1 .50"w.c. 5 minutes PASS <br /> I ®DRY 5 ®DRY []DRY ❑DRY [:]DRY ❑DRY []DRY []DRY []DRY <br /> M1 ml ml ml ml ml ml M1 M1 <br /> 2 ®DRY 6 HDRY ❑DRY ❑DRY ❑DRY [_-]DRY ❑DRY []DRY []DRY <br /> R11 m1 m1 ml ml m1 ml m1 M1 <br /> 3 HDRY 7 HDRY ❑DRY ❑DRY ❑DRY []DRY []DRY []DRY []DRY <br /> M1-- ml m1 ml ml M1 ml M1 ml <br /> 4 HDRY 8 HDRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY []DRY <br /> M1 ml ml m1 m1 ml m1 ml ml <br /> ® Job Complete Repairs Done to Pass Test: <br /> ❑ I Not Com fete _Repairs.Still Needed: <br /> Parts: I Ione Drop Tube rings Fill Adaptor Gaskets Hoses Whip Hose <br /> Nozzles Breakaways PV Valves Others: <br />