Laserfiche WebLink
SWRCB,January 2002 Page :� of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ©Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1110-15 Psi <br /> ` Piping Run#1 Piping Run#2 Piping Run#3 Piping Run <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. 110' Approx. 120' Approx. 120' <br /> Product Stored: Diesel Super 91 Regular 87 <br /> Method and location of Test boot at Test boot at Test boot at <br /> pip in -run isolation: UDC#3&4 UDC#3&4 UDC#3&4 <br /> Wait time between applying 30 Minutes 30 Minutes 30 Minutes <br /> ressure and starting test: <br /> Test Start Time: 9:25 9:15 9:05 <br /> Initial Reading(Ri): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 10:25 10:15 10:05 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour I Hour <br /> Change in Reading(RF-RI): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass 0 Fail X Pass 0 Fail Pass Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />