Laserfiche WebLink
SWRCB,January 2002 Page 71 of <br /> 9. SPHA./OV'FRFUL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X (See Comments below!) <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec6) <br /> Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> TestResult: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fair ❑ Pass ❑Fail <br /> Comments--(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> SpiWOverfill Boxes tested annually with Monitoring System Certification. <br />