Laserfiche WebLink
Mo c A RES ' NSE PL - x <br /> CO EWDXM !CQMMM FAC rev 3MEM <br /> S oNDA_RYA NT OF <br /> cRo M cE T _o IICT L <br /> MM SLE PUMP&HUMWN <br /> ARCO Facility 2093. Address 3425 N. Tracy Blvd. <br /> Tracy, CA 95376 <br /> This plan is designed to meet the monitoring and response requirements of section 2634, Article 3, <br /> Title 23, CCR. <br /> 1. ONI 1®RIN fz E•®V 1j' T <br /> Secondarily contained storage tanks and lines at this facility are monitored by a continuous <br /> electronic leak detection system which consists of an alarm panel, sensors and associated electronics. <br /> Liquid sensors are installed in the annular space of each double wall tank and product line piping <br /> sump. Whenever a sensor detects the presence of a liquid there is both a visual and audible alarm at <br /> the control panel. In addition, the continuous monitor on the product piping system will shut down <br /> the pump and activate the alarm system when a release is detected or if the continuous product <br /> piping monitoring system fails or is disconnected, the pumping system will shut down. <br /> Automatic line leak detectors are installed on the secondarily contained pressurized product <br /> piping. The line leak detector will detect a loss of pressure in the product lines and restrict the flow <br /> of product. <br /> 2. MAINTENANCE SCHEDULE OF MOMTORINQ EQUIP <br /> The continuous electronic leak detection system including line leak detectors will be inspected <br /> according to the manufacturer's instructions by an outside contractor once during each calendar year. <br /> 3. ROJaM MQMMQMG� OC <br /> On a daily basis the facility operator shall: <br /> A.Inspect the control panel for visual and audible alarm signals to confirm that the unit is <br /> operating. <br />