My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_1993-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 4:32:06 PM
Creation date
6/3/2020 9:48:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2002
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_1993-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Secondary container otherdouble-walled tanks (includes intercept <br />and detection systems).*action 2633 (f)] <br />® A. Backfill in secondary container. [Section 2635 (c) 1-81 <br />® B. Pore space of granular material used as backfill for primary container(s) complies with Section 2631 <br />(9). (Engineering data to support capacity requirement]. <br />® C. Two or more primary containers within secondary container. (include information on product <br />compatibility) <br />D. Secondary container capable of precluding highest anticipated groundwater. <br />® E. Secondary container sloped to a monitoring sump from which leakage or precipitation can be detected <br />and removed. <br />® F. Yater tight corner which extends at least a foot beyond each boundary of the secondary container <br />excavation, sloped to drain away from excavation. <br />20. Secondary container(s) thickness, density, composition, product compatibility. <br />® Sized to contain unauthorized releases from primary containers to allow sufficient time for detection and removal. <br />[Section 2631 (c)] <br />21. Secondary containers) volumetric requirements: (Section 2631 (e) (1) <br />and (2)] <br />® A. Single primary containers = 100%. <br />® B. Multiple primary containers = 150% of Largest primary container or 10% above aggregate. <br />22. Secondary container(s) open to rainfall. C Section 2631 Ml <br />Volumetric requirements = 24 hours of 100 year storm in addition to primary container volumes. <br />23. Secondary container floor. [Section 2631 Ci)1 <br />® A. Constructed on firm base. <br />B. Sloped to collection sump C 1/8 inch per foot). <br />® (1) one or more access casings installed in sump. <br />® ;(a) Size to allow removal of collected liquid. <br />Cb) Extended to ground surface. <br />CO Covered with a Locked waterproof cap or <br />within a secured facility. <br />® Cd) Thickness allows for anticipated stresses. <br />(e) Construction materials are not weakened stored product or will not donate, <br />capture, or mask constituents to be monitored. <br />24. Membrane liner specifications. [Section 2631; k, L, and ml <br />a <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.