Laserfiche WebLink
• * iUIM. <br />• Y Y # <br />ARCOY Y i' I I Y Y <br />WALL <br />. Y AN12 --SINGLE- <br />WALL LINES <br />a <br />ARCO Facility 209'3, Address 342G <br />lines - Automatic Pressure Line Leak Detectors and Annual Line Tightness Testing in <br />accordance with Section 2643 (d)(1) and (3), Article 4, Title 23, CCR. <br />1401 i :1 :51#3 4111110 <br />• • • <br />Inventory reconciliation will be performed In compliance with the details of Section 2646, <br />Article 4, Title 23, CCR (copy attached and hereby incorporated). <br />•. • • a♦ .: • •� . r . •. -_ <br />B. The physically measured inventory shall be determined at approximately the same time <br />each day by taking liquid level measurement (stick reading) and converting it to <br />gallons usin•a calibration <br />calculateda The inventory shall be determined at approximately the same time of day f• <br />each business day by adding the inputs and subtracting the withdrawals from the <br />physically measured inventory determined the day before. <br />D. These variations shall be summed for a period of one month. Monthly variations M <br />exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 ga;,;j <br />must be investigated in accordance with instructisattached. <br />