Laserfiche WebLink
In addition to the training covering subjects mentioned in Sections 3 and 4 above, training <br />needed for the operation of the tank system and monitoring equipment includes: <br />How i <br />Take tank level measurements <br />Readdispenser meters <br />close- Inspect equipment <br />- Recognize warning signs: dispenser hesitations, meter spins and odors <br />- Manually dispenser impact. <br />lve <br />Replace dispenser filters I <br />- Shut down the system with and location of : ARCOmatic switch, electrical pan <br />breakers, and emergency shut off switch <br />- Test the electronic • • <br />MENEXMIRUMI <br />Written records of all monitoring, testing, and maintenance performed shall be maintained <br />i.. or •ff-site at a readily available• s • period • <br />f at least 3 years. These <br />records must be made available, upon request within 36 hours, to the local agency or the <br />Board. <br />