My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_1993-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 4:32:06 PM
Creation date
6/3/2020 9:48:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2002
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_1993-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Petroleum hydrocarbons were detected in ground water samples collected from on-site <br />monitoring wells ATR -2, ATR -3, and ATR -4 during quarterly sampling in October 1992. <br />On December 16, 1991, Brown and Caldwell performed a series of vapor extraction pilot <br />tests at the Site. The results of the test are contained in a report prepared by Brown and <br />Caldwell dated February 18, 1992. The results of the tests indicated that the subsurface <br />conditions at the Site were favorable to soil venting remediation techniques. <br />ARCO plans to implement a vapor extraction and ground water treatment system to <br />remediate petroleum hydrocarbons in soil and ground water at the Site. Brown and <br />Caldwell is in the process of designing the remediation system for the Site. A <br />remediation plan dated May 1, 1993 was prepared by Brown and Caldwell and submitted <br />to the PHS-EHD. <br />The proposed work to be performed by Roux as part of the UST removal project will <br />include the following: <br />• Observe the removal of the USTs and product lines and the excavation of soil in <br />and around the existing USTs and product lines. <br />• Collect samples of native soil at intervals of 20 linear feet from the base of the <br />product line trenches. <br />• Collect a water sample from the standing water in the tank cavity excavation. <br />• Collect composite samples from the stockpiled soil. <br />• Submit the soil samples to a California Department of Health Services certified <br />laboratory for chemical analysis. <br />• Supervise the disposal, and, if required, on-site aeration of the stockpiled soil. <br />• Oversee the installation of tank cavity wells and subsurface piping for use in a <br />future soil and ground water remediation system. <br />3 Doc #A159WO1.1.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.