My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 3:43:58 PM
Creation date
6/3/2020 9:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2002-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L12horing System Certification <br /> Site Address: 3425 TRACY BLVD Date of T ng/Se ' : 01/11/2006 <br /> F. in-Tank Gauging/SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folloiNing checidleb- <br /> E]Yes ❑No• Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ®Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ®Yes ❑No* Was accuracy of system product level readings tested? <br /> ®Yes ❑No* Was accuracy of system water level readings tested? <br /> ElYes ®No* Were all probes reinstalled properly? <br /> Q Yes No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not Installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> x❑Yes ❑No* ❑N/A (Check all that apply)Simulated leak rate: ❑ 3 g.p.h®0.1 g.p.hE]0.2 g.p.h <br /> X Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> x Yes ❑No* Was the testing apparatus property calibrated? <br /> ❑Yes [:]No* ®N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> M Yes ❑No* ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No* ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> M Yes ❑No* ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ®Yes []No- ❑N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> MYes ❑No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H.below,describe how and when View deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.