Laserfiche WebLink
SWRCB,January 2002 Page 2. <br /> 9. SPELL/OVERFELL CONTAPOIENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: FISpill Bucket Manufacturer �x Industry Standard Professional Engineer <br /> Other(Spec) <br /> Test Method Used: ❑ Pressure ❑ Vacuum Fj] Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> SEEMEMEM <br /> Spill Boz# 1 Spill Box# 2 Spill Box# 3 Spill Boz# 4 <br /> Bucket Diameter: 11 11 11 11 <br /> Bucket Depth: 10 10 10 10 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 5 5 5 <br /> starting test: <br /> Test Start Time: 9:15 9:15 9:15 9:15 <br /> Initial Reading(Ri ): 911 911 9 if 9" <br /> Test End Time: 10:20 10:2 0 10:2 0 10:2 0 <br /> Final Reading(RF ): gig 911 911 911 <br /> Test Duration: 60MIN. 60MIN. 60MIN. 60MIN. <br /> Change in Reading(R F-1 4 Oil oil 0 if 01, <br /> Pass/Fail Threshold or PASS PASS PASS PASS <br /> Criteria: <br /> Test Result: X Past t� B P p aB ID El <br /> pan <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> SPILL BUCKETS FACTURER IS PHIL-L--FI-TE. <br />