My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 4:11:28 PM
Creation date
6/3/2020 9:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEST NO. 1- SECONDARY PIPE TESTING <br />Pae 1 of 2 <br />Test Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard <br />❑ Other (Spec) <br />❑ Professional Engineer <br />Test Method Used: <br />® Pressure <br />❑ Other (Sped) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Run #87-1 <br />Piping Run #87-2a <br />Piping Run #87-2b <br />Piping Run #91 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith. <br />Smith <br />Smith <br />Piping Diameter: XXX <br />Length of Piping Run: Est. <br />Product Stored: <br />Regular <br />Regular <br />Regular <br />Premium <br />Method and location of <br />piping -run isolation:Test Boots <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: Per Protocol <br />Test Start Time: <br />9:30am <br />9:30am <br />9:30am <br />9:30am <br />Initial Reading (RI): <br />5 PSI <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />10:30am <br />10:30am <br />10:30am <br />10:30am <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 Hr. <br />I Hr. <br />1 Hr. <br />1 Hr. <br />Change in Reading (RF -RI): <br />none <br />none <br />none <br />none <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss <br />No Loss <br />No Loss <br />No Loss <br />Test Result:Pass <br />Fail <br />0 Pass OFail <br />[R] Pass <br />❑Fail` <br />0 Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.