Laserfiche WebLink
s R <br /> g,q a <br /> OFF <br /> IED PROGRAM CONSOLIDATED F <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Pale 1 of 3 <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2• <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490.2 <br /> FACILITY ID#(Agency Use Only) 7r <br /> BUSINESS NAME(Same as Facility Name or DBA) ARCO 02093 3 <br /> BUSINESS SITE ADDRESS 3425 TRACY BLVD 103. BUSINESS SITE CITY TRACY 104 <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> �e equui m!ent manufacturers'instructions or annuall ,whichever is more fre uent.Such work must be erformed b ualified ersonneL[23 CCx§z632�263a,2638,2641] <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): _ _... 490-3.. <br /> ( P �')� 490-3b. <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 414. <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-7. MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUI3QCTURER: Veeder Root 490-9• MODEL#(S): 794390-407 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TA S).[23 CCR§2643] 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a-CONTINUOUS ❑ b.DAILYNIIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS eci ago 18. <br /> g•P• g•P• (Specify): a90-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] 490-20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2645] TESTING PERIOD: [:] a.36 HOURS El b.60 HOURS 422 z1. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS eci 490-24. <br /> Q ( P fY) 0-90-25. <br /> El99.OTHER(Specify): 490-266. <br /> 490-27. <br /> 3 I <br /> 1 <br /> ® I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> 1§26 6j SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED El c.PRESSURIZED El d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:Veeder Root 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 794380-323 490-33. <br /> I <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. I <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§2636] <br /> MLLD MANUFACTURER(S): 490-37. MODEL#(S): 490-38. <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39• <br /> ELLD MANUFACTURER(S):Veeder Root 49040. MODEL#(S): PLLD 490.41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MPOMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES [:1 b.NO 490-44• <br /> ❑ 4.PIPE INTEGRITY TESTING. -____-........._..-.._.._. ...._.__ <br /> 490-45. <br /> TEST FREQUENCY: _ E] a.ANNUALLY [Ib.EVERY 3 YEARS [Ic.OTHERS eci 49046. <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TME SYSTEM OPERATED* 490-49. <br /> •Allowed for monitorin of unburied.emerge-•nom- eneratorfuel pipi o� HSC„§•25281L5(bj(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(.)(3)] _ _ 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ❑ <br /> 99.OTHER(Specify) - -- -- -- 490-52. <br /> 490-53. <br /> 3 � <br /> Arco 02093,Belshire Environmental Services Page 1 of 6 <br />