Laserfiche WebLink
SWRCB.January 2002 GR Job#1820927.1 Page 1 of 1 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Spech) <br /> Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Speeifv) <br /> Test Equipment Used:Pressure Gauge Equipment Resolution:0 .5 si <br /> Piping Run#87A-sip Piping Run#87B Sip Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 4.5 11 4 .511 <br /> Length of Piping Run: 3 0f t 3 0 f t <br /> Product Stored: Gas Gas <br /> Method and location of boot boot <br /> piping-run isolation: <br /> Wait time between applying 5 mins 5 mitis <br /> pressure/vacuum/water and <br /> -starting test: <br /> Test Start Time: 11:00 11:00 <br /> -Initial Reading(Ri): 5 psi 5 psi <br /> Test End Time: 12: 00 12 :00 <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> Comments—(include information on repairs made prior to lesting and rccontnumded follo►v-tip for failed rests) <br />