Laserfiche WebLink
s ° <br /> SWRCB,January 2002 GR,lob#18200927.1 Page 2 of 2 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer 0Industry Standard []Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: ❑Pressure []Vacuum OHydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used:INCON TS-ST5 Equipment Resolution:0.0 0 01 <br /> NNIMM so= <br /> Sump#877 S Sump#$7 Sump#87 Siphon sump#91 <br /> Sump Diameter: 4 411 4411 4 411 4 411 <br /> Sump Depth: 5511 541' 531' 5411 <br /> Sump Material: fiberglass fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 2111 3 311 3 511 2111 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 4111 3411 3911 3911 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Fair Fair Fair Fair <br /> Portion of Sump Tested' 4 611 4011 4 511 4511 <br /> Does turbine shut down when 0 yes ❑No DNA <br /> sump sensor detects liquid(both 0 Yes 11 No 0 NA 0 Yes O No DNA QYes []No [)NA <br /> and water)?" <br /> Turbine shutdown response time 6 sec 6 sec 6 sec 6 sec <br /> Is system programmed for fail-safe 0 Yes 0 No 13 NA OYes 0 No [INA 0 Yes ❑No DNA 0 Yes ❑No 0 NA <br /> shutdown?" <br /> Was fail-safe verified to be 0 Yes a No ❑NA <br /> OYes l]No DNA ®Yes ❑No DNA 0 Yes ❑No [INA <br /> o erational?" <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 mins 15 mins 15 mins 15 mins <br /> test: <br /> Test Start Time: 9:50 am 10:30 am 11:00 am 11:29 am <br /> Initial Reading(RI): 3 .1795 5.2137 4 .7504 4 .0735 <br /> Test End Time: 10: 05 10:4 5 11:15 11:44 <br /> Final Reading(RF): 3 .1793 5.215 0 4 .7506 7 .0738 <br /> Test Duration: 15 mins 15 mins 15 mins 15 mins <br /> Change in Reading(Rj--RI): 0 .0002 0. 0013 0 .0002 0.0-003 <br /> Pass/Fail Threshold or Criteria: 0.002 0 . 002 0.002 0.002 <br /> Test Result: ® Pass ®Fail 0 Pass D Fail 19 Pass ®Rai! 0 Pass a Fail <br /> Was sensor removed for testing? 0 Yes ❑No O NA OYes ❑No ❑NA Oyes ❑No ❑NA 0Yes 0 N 0 N <br /> Was sensor properly replaced and 0 Yes I]No ®NA OYes ❑No ❑NA OYes ONo ❑NA OYes ❑No ❑NA <br /> verified functional after tes tim? <br /> Comments—(include information on repairs made prior to testing;and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />