Laserfiche WebLink
SWRCB,January 2002 Page 1 of 1 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer FF' Industry Standard r7 Professional Engineer <br /> Il Other(Specify) <br /> Test Method Used By: FF Pressure r7, vacuum Hydrostatic <br /> r7 Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: .20 <br /> (Tan7c'1 2,= <br /> T, (T1 <br /> REGULAR)STP PREMIUM)STP REGULAR)STP Siphon Pipe for T-I to <br /> Containmt t.to 1/2, Containment i to 1/2, Containment 1 to 5/6, <br /> T 2 and T4 <br /> Piping Material: 3/4 3/4,5/6,_7/8_ 718 , dw fiberglass <br /> Piping Manufacturer: dw fiberglass dw fiberglass dw fiberglass smith <br /> Piping Diameter: Smith Smith Smith 4 in. <br /> Length of Piping Run: 3 in. 3 in. 3 in. 30 ft. <br /> Product Stored: 120 ft. 210 ft. 150 ft. <br /> Method and location of REGULAR PREMIUM REGULAR <br /> piping-run isolation: stp sump <br /> Wait time between applying <br /> stp sump stp sump stp sump <br /> pressure/vacuum/water and 5 min <br /> starting test: 5 min 5 min 5 min <br /> Test Start Time: 09:46:00 <br /> Initial Reading(RI): 09:46:00 11:04:00 09:46:00 5.00000 PSI <br /> Test End Time: 5.00000 PSI 5.00000 PSI 5.00000 PSI 10:46:00 <br /> Final Reading(RF): 10:46:00 12:04:00 10:46:00 5.00000 PSI <br /> Test Duration: 3.00000 PSI 5.00000 PSI 5.00000 PSI I hr <br /> Change in Reading(RF-RI): 1 hr 1 hr 1 hr 0.00000 PSI <br /> Pass/Fail Threshold or -2.00000 PSI 0.00000 PSI 0.00000 PSI <br /> +/-0.00000 <br /> Criteria: +/-0.00000 +/-0.00000 +/-0.00000 <br /> tie esu Paas <br /> Fait <br /> as ; Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2335159 <br />