My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:04:04 PM
Creation date
6/3/2020 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6frun-RrAa inti. GR Job# 17203105 <br /> D, Results of Testing/Servicing RECENED <br /> Software Version Installed: 333.05 0 C T 12 2017 <br /> Complete the following checklist: <br /> r es ® o Is the audible alarm operational? <br /> Yes ® No' Is the visual alarm operational? <br /> 11 Yes [3 No` Were all sensors visually inspected,functionally tested,and confirmed operational? OEFDARTMEHT <br /> jj Yes 13 No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> [Z Yes ❑ No" Nalarms are relayed to a remote monitoring station,is all communication equipment(e.g.modem)operational? <br /> ® NIA <br /> ff Yes ® No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system <br /> N/A detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check all that apply) <br /> rx Sump/Trench Sensor; 9 Dispenser Containment Sensor.Did you confirm positive shut-down due to leaks and sensor <br /> failureldisconnection? r, Yes; ® No. <br /> 1.3 Yes ® No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> ® N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If so,at what percent <br /> of tank capacity does the alarm trigger? --20--% <br /> ® Yes No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement earls in Section E,below. <br /> -6—Yes No Was liquid found Inside any secondary containment systems designed as dry systems?(Check all that apply) []Product; ❑Water. If <br /> yes,describe causes in Section E,below. <br /> Yes ® No*--I Was monitoring system set-up reviewed to insure proper settings?Attach set-up reports,if applicable. <br /> Yes ❑ No' I is all monitoring equipment operational per manufacture's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. - Comments: <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.