Laserfiche WebLink
by GR Job# 17203106 <br /> Emergency shut- (ESO) Testing Results & checklist <br /> .,rAvon cto r infor< Eton u�cuTE <br /> ST <br /> .; <br /> Sits#Arco 2093 Co.Name: Gettier an Inc. Date:9/0 6/2 017 <br /> Address: Phone 925-551-7555 <br /> 3425 Tracv Blvd. Lead Technician:Gilbert Garcia x PASS <br /> City/St:Trac CAI Name: or <br /> eMaint.W.O.#10 116 a IPassport: FAIL(Next Day Repair Required) <br /> S' nature <br /> The objective of this test is to provide assurance that the when the Estop switch Is activated,all the fueling system circuits{turbines,and dispensers)are do-energized,an <br /> remain ds-onergtrsd until they are re-ast manually). The test procedures and guidelines shall be In accordance with the E-Stop Testing Process. <br /> # The following krtonnation/s to be completed. XT.saw <br /> YaWA <br /> SITE <br /> 1 Number of E-Stop switches: <br /> 2 Type of Switch? Push Pull.0 Momentary]K Plain light/Toggle Other: <br /> (if Momentary type,locate and identify re-set button): In Elect Room <br /> s Type of Turbine Control Relay System(Electrical Distribution Center): <br /> Brown Box X Power Solution _0 Other Custom Fabricated <br /> a T e of Turbine Control Relays: Make ModelYZC <br /> 5 Type of Line Leak Detection: Mechanical ELD/CPT ✓ PLLD <br /> x t�ERFO CE TEST <br /> 6 Does the E-Stop shutdown power to the DISPENSERS <br /> 7 Does the E-Stop shutdown power to the TURBINES <br /> 8 Is the 220 voltage to the turbine relay removed(either the line side or the motor side of the contacts or the coil)? <br /> 9 Are the DISPENSER BREAKERS clearly identified/labeled? <br /> 10 Are the TURBINE BREAKERS clearly identified/labeled? <br /> 11 Are all the ESOs accessible and dearly identified/labeled? <br /> 12 Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? <br /> 12A If#12 is NO,briefly describe what was wrong: <br /> 12B How was it corrected: <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site). The technician MUST notify the <br /> Site Manager of the problem,place an"Out of Service"Tag on the ESO(s), and identify an alternate mean(i.e., locate <br /> circuit panel,dearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D Elite Customer Solution Center has been contacted for the repair. <br /> eMaint.W.O.Ticket# <br /> 11 Site's fueling system is fully operational. x <br /> 12 All equipment secured and any access ports,lids,enclosures are dosed. x <br /> 13 All safety barricades,and any debris was been removed. x <br /> ENTS <br /> OCT I 201° <br /> 8ubmk come copy with other documentation In E-Maintenance. <br />