Laserfiche WebLink
0 0 <br />bp GR tu"EIVEL <br />Emergency hut- (ESO) Testing ResultsMc <br />Facility Information Contractor Information TEST Results <br />Site # Arco SS 2093 Co. Name: Gettler-Ryan Inc. Date: 9/702016 ENVIRONMENTAL H ALTF <br />Address: 3425 Tracy Blvd. Phone 925-551-7555 <br />City d St: Tracy, CA Lead Technician: Gilbert Garcia x PASS DEPARTMENT <br />eMaint. W.O. # 10051491 Name: or <br />Passport: FAIL (Next Day Repair Required) <br />Signature <br />The objective of this test is to provide assurance that the when the E-Stop switch is activated, all the fueling system circuits (turbines, and dispensers) are de-energized, and <br />remain de-energized until they are reset manually). The test procedures and guidelines shall be in accordance with the E-Stop Testing Process. <br /># The following information Is to be completed. x To select <br />Y" No NIA <br />SITE DATA <br />1 Number of E-Stopswitches: 2 <br />2 Type of Switch? Push Pull _ Momentary x Plain light / Toggle Other: <br />(if Momentary type, locate and identify re-set button): In Elect Room <br />3 Type of Turbine Control Relay System (Electrical Distribution Center): <br />_ Brown Box x Power Solution _ Other _ Custom Fabricated <br />4 Type of Turbine Control Relays: Make FE Petro Model IST VFC <br />5 T e of Line Leak Detection: Mechanical ELD/CPT x PLLD <br />PERFORMANCE TEST <br />8 Does the E-Stop shutdown power to the DISPENSERS x <br />7 Does the E-Stop shutdown power to the TURBINES x <br />8 Is the 220 voltage to the turbine relay removed (either the line side or the motor side of the contacts or the coil)? x <br />9 Are the DISPENSER BREAKERS clearly identified / labeled? x <br />10 Are the TURBINE BREAKERS clearly identified / labeled? x <br />11 Are all the ESOs accessible and clearly identified / labeled? x <br />12 Did the ESO(s) function correctly (de-energized from either the line side or the motor side of the contacts or the coil)? x <br />12A If #12 is NO, briefly describe what was wrong: <br />i2B How was it corrected: <br />12C If repair or ESO functionality cannot be corrected same day (prior to leaving the site). The technician MUST notify the Site <br />Manager of the problem, place an "Out of Service" Tag on the ESO(s), and identify an alternate mean (i.e., locate circuit <br />panel, clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br />12D Elite Customer Solution Center has been contacted for the repair. <br />eMaint. W.O. Ticket # <br />POST TEST <br />11 Site's fueling system is fully operational. x <br />112 JAII equipment secured and any access ports, lids, enclosures are closed. x <br />13 All safety barricades, and any debris was been removed. x <br />COMMENTS <br />Submit completed copy with other documentation In E-Maintenance. <br />