My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:04:04 PM
Creation date
6/3/2020 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Explanation of Figure 1 Dimensions <br /> A • Distance from the seat surface of the upper drop tube to the bottom of the undergound storage tank.The seat <br /> surface will vary depending on the type of installation (see Figure 2). <br /> B • 95%tank volume—obtained from the tank chart provided by the tank manufacturer. To find the 95% <br /> tank level on the tank chart, multiply the actual tank capacity by.95. Then find on the tank chart the level <br /> measurement that matches the calculated volume the closest. <br /> Note: If local codes allow the positive shutoff level to be different from 95%,the installing contractor may adjust <br /> the"B"dimension per the tank chart to achieve the desired level <br /> Note: If tank tilt is an issue, the installing contractor may use best judgment to adjust"B"dimension accordingly, <br /> so"... none of the fittings located on top of the tank are exposed to product due to overfilling,"per EPA <br /> 40CFR280 <br /> Underneath Fill Adapter Underneath Bucket Inside Bucket <br /> (EBW Legacy Series) (Phil-rite Series) (Defender Series) <br /> ■ <br /> r ' <br /> A <br /> 0 O 0 <br /> A <br /> A <br /> A <br /> Figure 2:Installation Dimensions per Spill Container <br /> MARKING & CUTTING THE TUBES 2. Mark the lower drop tube with the length"Y" <br /> 1. Mark the upper drop tube with the length"X" calculated from Figure 1. <br /> calculated from Figure 1, measuring per Figure 3: <br /> Upper Drop Tubes Lower Drop Tube Cut straight <br /> Dual Point i <br /> i Measure from flange <br /> /tion:ox.45° <br /> I X —I Y <br /> Figure 4:Lower Drop Tube <br /> Poppeted Coaxial(EBW) <br /> I Measure from retaining ring <br /> X ---I <br /> Non-Poppeted Coaxial(EBW) <br /> Measure from bottom of lug <br /> I X <br /> Figure 3:Dimension X for Upper Drop Tube <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.