My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:04:04 PM
Creation date
6/3/2020 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br /> SAN',-.JOAQUIN <br /> C-C."L, N 1 Y F-a 1tel 11�j <br /> RETURN TO COMPLIANCE CERTIFICATION <br /> Any MIN Violations noted in the'Notice to Comply"in the attached Inspection Report must be corrected within 30 days of <br /> receipt of this inspection. This certification form must be submitted to the Environmental Health Department(EHD)address <br /> at the top of this form within 30 days of receipt of the Inspection Report. HSC 25404.1.2(c)(1) <br /> All corrections to other violations noted in the attached Inspection Report(I R)or Continuation Form,or disputes to any <br /> violations,are to be submitted using this certification and returned to EHD in 30 days unless otherwise specified in the <br /> Inspection Report. HSC 25185(c)(3) <br /> Note: All EHD staff time associated with failing to comply by the above noted dates will be <br /> billed at the current hourly rate. <br /> For this certification to be complete, the operator of the site must include: <br /> A statement documenting what corrective actions were taken or will be taken for each Violation <br /> Copies of sample results/manifests/training recordslother appropriate paperwork,and/or photos verifying <br /> corrections <br /> Operator's certification <br /> Inspection Date: August 30, 2018 Inspected By: ZUNA BARKER <br /> Facility Address: 3425 TRACY BLVD,TRACY CES ID: 10181087 <br /> I certify under penalty of law that: <br /> 1. 1 have corrected the violations specified in the Inspection Report from the above-mentioned inspection date. <br /> 2. 1 have personally examined the folloWing documentation subrrdfted as proof of compliance FOR EACH VIOLATION <br /> and I believe the information to be true,accurate,and complete: <br /> Photos I Paperwork Statement <br /> 3. 1 am authorized to submit this certification on behalf of the Respondent. <br /> 4. 1 am aware that there are significant penalties for submitting false information,including the possibility of a fine <br /> and/or imprisonment for known violations. (HSC 25191) <br /> -�Wkj L izemil, CfM7LI$kKZ7 Gay `T <br /> Name: Title: <br /> Signature: 'Date: <br /> RECEIVED <br /> SEP 2 8 2018 <br /> ENVIRONMENTAL HEALT8 <br /> DEPARTMF?,,,!-1- <br /> 1868 E.Hazelton Avenue Stockton,California 952051 T 209 468-34201 F 209 464-0138 1 www.sicehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.