Laserfiche WebLink
i-10911) 1)•7)1 <br />3011Y 30° 'MANHOLE WITii LINER <br />-2;i3" VAPOR <br />MANIFOLD FOR <br />STAGE II <br />PIPING <br />VAPOR LINE <br />AND MANIFOLD <br />AND VENT PIPING CONNECTIONS WITH BALL FLOAT OVERFILL <br />� <br />. L <br />sc•.c 1'1ON5 <br />ENGINEERING SKETCH PAD <br />OIL CHEMICAL <br />21 <br />0 <br />NO SWING JOINT OR FLEX. CONN. REQUIRED IN F. G. PIP1': <br />.IF AT LEAST 4 FT. OF STRAIGHT RUN IS PROVIDED BETWEE': <br />ANY DIRECTIONAL CHANGE EXCEEDING 30 DEGREES. <br />I <br />.B <br />4" EXTRACTOR FITTING $ RISLR <br />USE 4" x 3" x 2"/3" IN ALL <br />TANKS FOR CONNECTION OF VAPOR <br />MANIFOLD PIPING, 3" 0 STAGE I_ <br />VAPOR LINE CONN., AND 2" 0 <br />VENT PIPING CONN. <br />4" FLUSH TYPE FILL <br />W/ SCREW CAP _ <br />4. <br />UNLEADED <br />GASOLINE <br />`�j LEADED GASOLINE -- .. j� , q <br />1 L <br />3" 0 FIBERGLASS VAPOR / <br />t LINE \0 I ISLIVrDS/ I <br />O„ „ <br />TYPICAL PUMP M. H. ORIENTATION <br />Ir <br />,1 <br />211 <br />gv�ggg <br />UNLEADED GASOLINE <br />Y/81 <br />1/116" <br />- <br />0 BLEED HOLE >C � <br />N <br />5 ✓3/4 HP SUBMERGED PUMP -� <br />WITH LEAK DETECTOR <br />R -"I <br />r•OWENS-CORNING DOUBLp WALL TANKS <br />MODEL DVIT 1) WITH 3-22"0 MANWAYS GASOLINE STORAG <br />SCHEMATIC ARRANGEMENT OF PIPING <br />AT SUBMERGED Pt1MP STAGE II <br />VAPOR LINE <br />AND MANIFOLD <br />AND VENT PIPING CONNECTIONS WITH BALL FLOAT OVERFILL <br />PROTECTION <br />sc•.c 1'1ON5 <br />ENGINEERING SKETCH PAD <br />OIL CHEMICAL <br />�E0 Or <br />AP-84018[DDEVELOPMENT <br />o•r. w1��� <br />R -"I <br />