Laserfiche WebLink
UNDERGROUND STORAGE TANK 41 <br /> MONITORING PLAN- PAGE 1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION Mol. <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Mot. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agenev Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) shell&Mini Mart 136186 M03. <br /> BUSINESS SITE ADDRESS 3725 Tracy Boulevard M04_ CITY Tracy Me5. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY Moe. ❑ 99.OTHER(Specify) <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor,line leak <br /> detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification form,Hazardous <br /> Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> _ IV. TANK MONITORING_ <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10. <br /> ® I.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZEDMI1. <br /> ❑ d.VACUUM <br /> PANEL MANUFACTURER: Veeder Root M12. MODEL#: TLS-350R M13. <br /> LEAK SENSOR MANUFACTURER: Veeder Root M14. MODEL#(S):794380-301 MI5. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: M17. <br /> IN-TANK PROBE MANUFACTURER: Veeder Root MIR' MODEL#(S): 847390-109 M19. <br /> LEAK TEST FREQUENCY: ® a.CONTINUOUS ❑ b.DAILY/NIGHTLYM2o. <br /> ❑ c.WEEKLY <br /> El d.MONTHLY ❑ e.OTHER(Specify): <br /> M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ® b.0.2 g.p.h. ❑ c.OTHER(Specify): M22 M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Mea_ <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): Mev, M27. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires eq agency approval) <br /> ❑ 99.OTHER(Specify): M28. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> ® I.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.VACUUM M31. <br /> PANEL MANUFACTURER: Veeder Root M32. MODEL#: TLS-350R M33. <br /> LEAK SENSOR MANUFACTURER: Veeder Root _ M34. MODEL#(S): 794380-352 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ® a.YES ❑ b.NO M3e. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M37. <br /> ❑ 2.M ECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF PRODUCT FLOW <br /> WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): M38. MODEL#(S): M39. <br /> ® 3.E LECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Veeder Root Moo. MODEL#: 8484 M41. <br /> PROGRAMMED IN LINE TESTING: ® a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. N142. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? E a.YES ❑ b.NO N143. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS <br /> ❑ e.OTHER(Specify) MaS.May. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> *Requires agency approval *'Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(6)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M48. <br /> hwfwre-d(9/24/04)-1/4 <br />