Laserfiche WebLink
MAR -31-2008 12:19 Service Station Systems 408 938 8888 P.04 <br />Mon#oruig systaw C"neatioll 3 of 3 <br />s26Address: <br />Date of Testing/Servicing: <br />In - Tank Ganong 1SM Rqtdpment: 0 Check this <br />s box' o tank box if gaugog is used only for inveatoxy control. <br />El Check 0 a, <br />ft Zakging or SIR equipment is install . ad. <br />This section must be completed if mi -tank gaugingI equipment Is <br />to perform leak detection monitoring. <br />M# V M#- Ir4 E, MM I <br />it III I <br />NMI "M M -A M. Ldfodaamlp and residue buildqp? <br />i 11-11gi I <br />r� tett T M, <br />r, W M ff T. Wr V ".. <br />&I Y05 1, 0 NO*— JWere all km on the !p�P�inm�auuhcftraes maintenance checklist completed? <br />to Section H below, describe how and When Viese deficiencies were or wIff be correcta <br />G. Line TA&k Det ors (LW),- 0 Check this box if LUD's are not installed. <br />In Section H bebwj4exerffie how and when thcs6 dellelencles were or wM be corrected. <br />M Commenti; <br />TOTAL P.04 <br />