My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:52:19 PM
Creation date
6/3/2020 9:48:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231417_3725 N TRACY_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING PLAN — PAGE 2 <br />o o a <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) MSo. <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UDC) <br />PANEL MANUFACTURER: Veeder Root MSI' MODEL #: TLS-35OR M52' <br />LEAK SENSOR MANUFACTURER: Beaudreau M53' MODEL #(S): 500C M54, <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ® a. YES ❑ b. NO MSS' <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ® b. NO Mss. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ® b. NO M57- <br />2. MECHANICAL CONTINUOUS MONITORING (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />MANUFACTURER: Mss. MODEL #(S): M59. <br />❑ 3.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY Mso. <br />❑ 4. NO DISPENSERS <br />❑ <br />99. OTHER (Specify) Mst. <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST PERFORM ENHANCED LEAK M70. <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />i <br />� l Z <br />t f <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) MW <br />1, ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of January 1, 2005) <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND STATISTICAL <br />INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ OTHER (Specify): Mel. <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed <br />By January 1, 2005, this facility will have a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code <br />Council (ICC). By July 1, 2005, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST <br />systems. This training will include, but is not limited to, the following. <br />Operation of the UST systems in a manner consistent with the facility's best management practices. <br />The facility employee's role with regard to the leak detection equipment. <br />➢ The facility employee's role with regard to spills and overfills. <br />D Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after July 1, 2005, the initial training will be conducted within 30 days of the date of hire. <br />1�">r�/AD71I'�I(�1�zrT1�F����fl1�. <br />Please use this section to include any additional UST system monitoring -related information (e.g., additional information required by your local agency): Mss. <br />AS OF JANUARY 1, 2005, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION — <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN TITLE 23 CCR § 2715(c), AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE <br />FACILITY'S UST SYSTEMS IN ACCORDANCE WITH 23 CCR § 27150c . <br />' XI.0'�►'N•ER/0�.'�It�;TOR �IG�'A.TV�tE... , :; .... `. <br />CER CATION: I r/rdAy tlAt the information provided herein is true and accurate to the best of my knowledge. <br />O R/ TORSI REPRESENTING DATE: <br />Mgt. <br />❑ Owner M9o. <br />® Operator January4, 2006 <br />O ERATOR JN tint : M92 R/OP T E: M93' <br />(AganqXw 0-1y) This plan has been reviewed and: >6pproved ❑ Approved With Conditions ❑ Disapproved <br />Local Agency Signature: Date: <br />Comments/Special Conditions: <br />hwfwrc-d (9/24/04) - 2/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.