Laserfiche WebLink
9. S011 Bucket Testing RepoiWorm <br />SWRCB, January 2006 <br />This form is intended far use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: SHELL # 136186 <br />Date of Testing: 02/20/2008 <br />Facility Address: 3725 N. TRACY BLVD TRACY, CA, 95376 <br />Facility Contact: MANAGER <br />Phone: (2 0 9) 835-7608 <br />Date Local Agency Was Notified of Testing <br />Name of Local Agency Inspector (if present during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TANKNOLOGY , INC. <br />Technician Conducting Test: SCOTT HOLMAN <br />Credentials) : <br />Test Method Used: <br />CSLB Contractor <br />❑ <br />ICC Service Tech. <br />❑ <br />SWRCB Tank Tester <br />❑ <br />Other (Specify) <br />License Number: <br />I State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: <br />Fil Hydrostatic <br />❑ Vacuum <br />❑ Other <br />Test Equipment Used: WATER <br />Equipment Resolution: <br />Identify Spill Bucket(By Tank <br />1 REG FILL <br />2 1 REG VAPOR <br />3 2 PLU FILL <br />4 <br />2 PLU VAPOR <br />RNumber, <br />Stored Product, etc.) <br />FEKI�F�-] <br />irectBury <br />E]Direct Bury <br />E]Direct Bury <br />❑ <br />Direct Bury <br />Bucket Installation Type:Contained <br />in Sump <br />x❑ Contained in SumpX❑ <br />Contained in Sump <br />❑x <br />Contained in Sump <br />Bucket Diameter: <br />1211 <br />1211 <br />1211 <br />1211 <br />Bucket Depth: <br />1411 <br />1411 <br />1411 <br />1411 <br />Wait time between applying <br />1M <br />1M <br />1M <br />1M <br />vacuum/water and starting test: <br />Test Start Time (TI ): <br />10: 10 <br />11:30 <br />10:10 <br />11:30 <br />Initial Reading (RI ): <br />13.511 <br />13.511 <br />13.511 <br />13.511 <br />Test End Time (TF ): <br />11:10 <br />12 :3 0 <br />11:10 <br />12 : 3 0 <br />Final Reading (RF ): <br />13.511 <br />13.511 <br />13.511 <br />13.511 <br />Test Duration: <br />1HR <br />1HR <br />1HR <br />1HR <br />Change in Reading (R F - RI ): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />0 <br />0 <br />0 <br />0 <br />Criteria: <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: <br />/ _ <br />Date: 02/20/2008 <br />I State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />