My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:52:19 PM
Creation date
6/3/2020 9:48:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231417_3725 N TRACY_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Secondary Containment 'Testing Report Form <br />This for;n is intended for use b}- Contractors per jorrrring periodic lesting of US7'secondmy containment systems. Use ,he <br />appropriate pages of this form lu report resuhs for all components tested. The completed jor-m, wrinen test procedures, :nd <br />printouts fi,(Jrra rests (ij appl icable.), should be provided to the f tcilio) owner/operator for submittal to rhe local r-e,grrlalorV aRencu. <br />FACILITY MORMATION <br />TESTING CONTRACTOR ENFORMATION <br />Component: Pass <br />�Tattic <br />Fail , Not Repairs <br />Tested_ Made <br />Notes: <br />Annular <br />----I <br />❑ ; El C <br />L.'. ❑ <br />_ <br />- —. <br />�; <br />it <br />Seconclary Pipe - _ ❑ <br />Turbine Sump; <br />UDC - ❑ <br />— <br />J <br />.� ❑ <br />❑ <br />❑ 0 <br />~J <br />Fill Sump - ❑ <br />Cl <br />❑ Ll <br />7 LM Sump- J <br />�.1 <br />u Ll <br />L <br />-I <br />Spill Bucket - _� <br />❑ <br />LJ I:. <br />- <br />_ <br />+ij <br />7 ❑ <br />�� <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />USf'X� 17dZUt''ti P2'�l�C7l� 6A1 S eiL - - - _---- <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best uf'my knowledge, lire facts stated in this document tire accurate and in firll compliance ivitlt legal requirernena <br />Technician's <br />
The URL can be used to link to this page
Your browser does not support the video tag.