Laserfiche WebLink
SWRCB, January 2002 <br />I <br />9. S LL/OVERFILL <br />Page 2 <br />CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: El <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: El <br />Test Method Developed By: <br />F]Spill Bucket Manufacturer ❑X Industry Standard <br />Professional Engineer <br />El Other (Specify) <br />Test Method Used: <br />❑ Pressure F-1 Vacuum <br />❑X Hydrostatic <br />Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # 1 REG FILL Spill Box # 2 PLU FILL Spill Box # 3 PRE FILL Spill Box # 4 DIE FILL <br />Bucket Diameter: <br />11 11 11 <br />11 <br />Bucket Depth: <br />10 10 10 <br />10 <br />Wait time between applying <br />pressure/vacuum/water and <br />1M IN 1MIN 1MIN <br />1MIN <br />starting test: <br />Test Start Time: <br />1230 1230 1230 <br />1230 <br />Initial Reading (Ri ): <br />9 9 9.5 <br />9 <br />Test End Time: <br />1330 1330 1330 <br />1330 <br />Final Reading (RF ): <br />9 9 9.5 <br />9 <br />Test Duration: <br />1HR 1HR 1HR <br />1HR <br />Change in Reading (R F- RI) <br />0 0 0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />