Laserfiche WebLink
SWRCB, January 2002 <br />SLUOVERFILL hWES <br />Page 2 <br />9. CONTAINMENT <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By: <br />F-� Spill Bucket Manufacturer ❑X Industry Standard <br />F-1 Professional Engineer <br />11 Other (Specify) <br />Test Method Used: <br />❑ <br />Pressure ❑ Vacuum <br />❑X Hydrostatic <br />Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # 1 REG FILL Spill Box # 2 PLU FILL Spill Box # 3 PRE FILL <br />Spill Box # 4 DIE FILL <br />Bucket Diameter: <br />12 12 12 <br />12 <br />Bucket Depth: <br />14 14 14 <br />14 <br />Wait time between applying <br />pressure/vacuum/water and <br />5 5 5 <br />5 <br />starting test: <br />Test Start Time: <br />1210 1215 1235 <br />1320 <br />Initial Reading (RI ): <br />13.5 13 13.5 <br />13.5 <br />Test End Time: <br />1310 1315 1335 <br />1420 <br />Final Reading (RF ): <br />13.5 13 13.5 <br />13.5 <br />Test Duration: <br />1HR 1HR 1HR <br />1HR <br />Change in Reading (R F- RI) <br />0 0 0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />IM <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />