My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:52:19 PM
Creation date
6/3/2020 9:48:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231417_3725 N TRACY_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR -04-2006 09:16 Service Station Systems 408 938 8888 P.05 <br />Monitoring System Certification - 0 3 of 3 16 <br />Site Address: 3725 N. Tracy Blvd. @ 1-205 I Date of Testing/Servicing: 3/21/06 <br />F. In - Tank Gauging / SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging :equipment is used to perform leak detection monitoring. <br />Comnlete the following checklists <br />to Yes <br />n No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />0 Yes <br />0 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />0 Yes <br />0 No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />Ll Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />0 Yes <br />O No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): 0 Check this box if LLD's are not installed. <br />Comnlete the following checklist: <br />z Yes <br />a No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify I.LD performance? <br />0 N/A <br />(Check all that apply) Simulated leak reate: M 3 g.p.h. (1.); ❑ 0.1 g.p.h. (2.); ❑ 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />0 Yes <br />0 No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />0 Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />Cl Yes <br />❑ No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />® N/A <br />W Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />0 N/A <br />® Yes <br />0 No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />0 N/A <br />or disconnected? <br />® Yes <br />0 No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />0 N/A <br />malfunctions or fails a test? <br />N Yes <br />0 No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />0 N/A <br />N Yes <br />a No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section <br />H below. describe how and when these deftieacies were or will be corrected. <br />H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.