My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 12:59:25 PM
Creation date
6/3/2020 9:48:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231417_3725 N TRACY_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />DEC (5 2014 <br />1. Site map enclosed? YES NO [ ] ENVIRONMENTAL HEALi-H <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training cuert$caies fd94Th <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />,- <br />SA A)o A ZO A -e- 5 ti � � rt <br />BACIIE �Podn� ;EHAFXZ' is <br />Lu�'lI Re lee p"o ur- ±H AT W /9 S PART 0-1' 48&- <br />We- <br />y& -Eve- wL I( Re—move' AAL P19/z-rS Ff1G&,, j3cc`c._DRe14 <br />B4c,tRoo--_ , <br />-L(/• i l I -X Ael"_M9 w (/ T S%/4A/ A Z a. At., Se -r, c <br />1 G .4 <br />ly d 1 C14 G L Esti t/�/1 o.yn,.en l� ec. C.f 61 ])gPi4A ioi.o n r <br />7-P 1-c 1-'�! o T S222,1,,0 — hZeAAP_ <br />e) TY9746 Will NG 10,404it.— 7t. 1rMa-r 3s,- <br />10 <br />List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />D_ti S 244 sti /J " ��Q ��2 �S /� •t..i' �/L <br />
The URL can be used to link to this page
Your browser does not support the video tag.