Laserfiche WebLink
Ll <br />Monitoring System Certification - Page 3 of 3 <br />11 <br />Site Address: 3725 N. Tracy Blvd. Date of Testing/Servicing: 1130114 <br />F. In - Tank Gauging / SIR Equipment: Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the follo ing checklist: <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground -faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checkli ompleted? <br />* In Section H below, describe how and when these deficiencies were or will be eo acted. <br />G. Line Leak Detectors (LLD): Check thi ox if LLD's are not installed. <br />Comnlete the following checklist: <br />❑ Yes <br />❑ No* <br />For equipment start-up or annual equipment c ification was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rat . ❑ 3 g.p.h. (l.); ❑ 0.1 g.p.h. (2.); ❑ 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment rt -up certification and annual certification. <br />2. Unless mandated by Walagency, certification required only for electronic LLD start-up. <br />❑ Yes <br />❑ No* <br />Were all LLD's confirmed oegrditional and accurate within regulatory requirements? <br />❑ Yes <br />❑ No* <br />Was the testing apparatusptoperly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLD' oes the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic D's, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For el ronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or ' connected? <br />❑ Yes <br />❑ No* <br />or electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />❑ NJ <br />malfunctions or fails a test? <br />❑ Yes <br />❑ * <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />El /A <br />E3 Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: TLM's & LLD's are monitored by Veeder Root. <br />