Laserfiche WebLink
0 2 0 15 <br /> SWRCB,January 2002 Page of <br /> 10. SPILL/OVERFILL CONTAINMENT BOXES-, <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes [I <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X *See comments below <br /> Test Method Developed By: 11 Spill Bucket Manufacturer 11 Industry Standard [I Professional Engineer <br /> 11 Other(Specify) <br /> Test Method Used: 11 Pressure [-'I Vacuum F1 Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Spill/Overfill Boxes tested with Annual Monitoring System Certification. <br />