My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2003-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:15:50 PM
Creation date
6/3/2020 9:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2015
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_2003-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pse I of 2) <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I I I _ - 1 <br /> BUSINESS NAME(Same as FACILITY NAME) 5v P C e, S T O P <. ," c�, L 1° tJl1e,. 3_ <br /> BUSINESS SITE ADDRESS L CI'© f j M,41'W 5 T -_# G 103. CITY M,4N T`C-4 , 104. <br /> U.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632,2634 2638,2641 <br /> EQUIPMENT IS SERVICED ANNUALLY ❑ 99.OTHERS i 490.34 <br /> MONITORING E <br /> Q (Specify): 490.317 <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o.4 <br /> IV.TANK MONITORING IS PERFORMED USING TEE FOLLOWING METHOD(S): <br /> _EVCONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: jo a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: V e 9;>e tZ 'P oc>T• 4W7. MODEL#: ` i_S -3-19-0 490"s <br /> LEAK SENSOR MANUFACTURER: %/1►OG t2. tZ 0647. 490-9. MODEL#(S): 20 490-10 <br /> AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 49x11 <br /> PANEL MANUFACTURER: Vf."e_v -`lt+v j' 490-12 MODEL#: -7 7 9-) 490-13 <br /> IN-TANK PROBE MANUFACTURER: + 490-14. MODEL#(S): h/1 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> 490.18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2&p.h. ❑ c.OTHER(Specify): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49x20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490.22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490"24 <br /> 490-25 <br /> ❑99.OTHER (Specify): 490.26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> CONTINUOUS MONITORING OF PIPE/PIPING SUMPS)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) ✓ <br /> SECONDARY CONTAINMENT IS:91 DRY ❑b.LIQUIDFILLED 0c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER V E r:D e A '-p-00-r. 49030 MODEL#: L S 3S%> 49x31 <br /> LEAK SENSOR MANUFACTURER: V67rz_&C�, 490-321 MODEL#(S): 2_G9 4W33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. [�X YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. C1 a YES ❑b.NO 490.35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR2636 T <br /> 90-3 <br /> MLLD MANUFACTURER(S): ke_'b Tq C*_e_ 49x37 MODEL#(S): F X ( %qj <br /> 0 ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 gp h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S) 490.40. MODEL#(S): 490.41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> 4.PIPE INTEGRITY TESTING 49o45 <br /> TEST FRE UENCY 0 a.ANNUALLY 0 b.EVERY 3 YEARS c.OTHERS i 490-46490.17 <br /> El 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49 <br /> "Allowed for monitoring of unburied emergency gamaw fuel piping ordy per HSC 25281.5(bX3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 49453 <br /> UPCF UST-D(12/2007)114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.