Laserfiche WebLink
F In-Tank Gauging(SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> ❑ heck this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank ganging equipment is used to perform leak detection monitoring. <br /> Com fete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination;including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? - <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* li Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section Ii,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com tete the folHo ing checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify ILD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate g p L; ❑0.1 g p.h; ❑0.2 g.p.h. <br /> L,O Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> bO Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LUN,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LI Ds,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> Cl Yes Cl No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> /A or disconnected? <br /> ❑ Yes No* For electronic ILDs,does the turbine automatically shut off if arq%portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic I I.Ds,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes . ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Pwl,c 3 of 3 u SAI I <br />