Laserfiche WebLink
Monitoring Systema Certification <br /> Site Address: -SOS A AJ5 Date of Testing/Servicing: (S Z6 of <br /> F In-Tank Gauging/SIR Equipment: -0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ yes ® No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ yes ❑ No* Were all probes reinstalled properly? <br /> ❑ yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performaarice? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 3 g.p.h.'; ❑0.1 g.p.h.2; ❑02 g.p.h.2 <br /> Notes: 1. Required for equipment start-up certification and annual certification.- <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> ❑ Yes _p No* Were all LLDs confirmed operational and accurate within regulatory requirements. <br /> jP Yes ❑ No* Was the testing apparatus properly calibrated?. <br /> C] yes No*. For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off.if the LLD detects a leak? <br /> 0 N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> l N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine-automatically shut off if any portion of the monitoring system <br /> )29 NIA malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ,E1 N/A <br /> Yes Cl No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 1 *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: C?Z- <br />