My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1984-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
505
>
2300 - Underground Storage Tank Program
>
PR0231442
>
COMPLIANCE INFO_1984-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 4:49:19 PM
Creation date
6/3/2020 9:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1984-2002
RECORD_ID
PR0231442
PE
2361
FACILITY_ID
FA0006441
FACILITY_NAME
QUIK STOP MARKET #5124*
STREET_NUMBER
505
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
217-260-21
CURRENT_STATUS
01
SITE_LOCATION
505 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231442_505 N MAIN_1984-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Systema Certification <br /> Site Address: -SOS A AJ5 Date of Testing/Servicing: (S Z6 of <br /> F In-Tank Gauging/SIR Equipment: -0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ yes ® No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ yes ❑ No* Were all probes reinstalled properly? <br /> ❑ yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performaarice? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 3 g.p.h.'; ❑0.1 g.p.h.2; ❑02 g.p.h.2 <br /> Notes: 1. Required for equipment start-up certification and annual certification.- <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> ❑ Yes _p No* Were all LLDs confirmed operational and accurate within regulatory requirements. <br /> jP Yes ❑ No* Was the testing apparatus properly calibrated?. <br /> C] yes No*. For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off.if the LLD detects a leak? <br /> 0 N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> l N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine-automatically shut off if any portion of the monitoring system <br /> )29 NIA malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ,E1 N/A <br /> Yes Cl No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 1 *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: C?Z- <br />
The URL can be used to link to this page
Your browser does not support the video tag.