Laserfiche WebLink
• i <br /> •Monitoring System Certification <br /> .�.is i� <br /> Site Address: Je�6 l'J11� a N �� Date ofTesting/Servicing- <br /> F. In--Tank Gauging/SIR Equipment: eck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if M-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> V <br /> ❑ No•. Has all input .. been inspected for proper entry and ion.including testing for gtrnmd faults? <br /> ❑ No* W�all tank gang pmt visually for damage and residue buildup?❑ No's Was accu aiy ofsystem product level tested? <br /> ❑ No* Was accuracy of system water level readings tested? <br /> rg:VCS ❑ No* Were all pmbes.reinstalled properly? . <br /> ex ❑ No* Were all items on the equipment roam if rturees mainteriaaa checklist completed? <br /> • In the Section H,below,describe howand when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed <br /> Complete the following checklist: <br /> r. —.s <br /> ❑ No* For equipment start-up or annual equipment certification,was a leak'smrulated to verify LLD performance? <br /> -❑. N/A (Check dl apply) Simulated Ieak rate: h; ❑0.1 g_pli. • ❑02 g.phZ <br /> Notes: L Required for equipment start-up certification and annual certification. .. <br /> •2-Unless mandated by local agency,cmificationyequired only for electronic LLD start-up.. <br /> a-Yes' ❑ No*• Were all UDs confirmed operational and withinx*flatory requirements? <br /> ErTes U No* .Was the testing apparatus prop�y calibrated? - <br /> Aaryes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak?• <br /> ❑ NIA <br /> •[Ye <br /> ❑ No* -Forekctronic LLDs,does the turbine auto shut off if the LLD detects a leak? <br /> A <br /> a Na* For el LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> or disconnected? ° <br /> ❑'No*' For electronic LLDs, does the.turbine automatically shut off if any.•portion of•the-monitoring. system <br /> f�•�/A malfunctions or fails a test? <br /> ❑ No' For electronic LLDs,have all accessble wiring connections been visually' ed? <br /> ❑ No* -Were all items.on the equipment man s maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will bevorrected. <br /> IL Comments: <br />