Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />'® TanknoloW <br />TEST DATE: 11/06/98 8900 SHOAL CREEK, BUILDING 200 <br />AUSTIN, TEXAS 78757 (512) 451-6334 WORK ORDER NUMBER: 2206556 <br />CLIENT: PARADISO MECHANICAL SITE: QUICK STOP <br />Tank ID: 87 3 <br />Product: REG UNLEAD <br />Capacity in gallons: 10,000 <br />Diameter in inches: 92.00 <br />Length in inches: 352 <br />Material: DW JCTD ST <br />COMMENTS <br />Tank manifolded: No <br />Vent manifolded: No <br />Vapor recovery manifolded: YES <br />Overfill protection: YES <br />Overspill protection: YES <br />Installed: ATG <br />CP installed on: / / <br />PSI at tank bottom: <br />1.70 <br />Bottom to grade in inches: <br />Fluid level in inches: <br />66.50 <br />35.0 <br />UFT/OFT: <br />UFT <br />Make: <br />Fluid volume in gallons: <br />7740 <br />Model: <br />Tank water level in inches: <br />0.00 <br />S/N: <br />Test time: <br />09:48-11:53 <br />Open time in sec: <br />Number of thermisters: <br />5 <br />Holding psi: <br />Specific gravity: <br />0.720 <br />Resiliancy cc: <br />Water table depth in inches: <br />Test leak rate mVm: <br />Determined by (method): <br />NO WELL <br />Metering psi: <br />Leak rate in gph: <br />-0.021 <br />Calib. leak in gph: <br />Result: <br />PASS <br />Results: <br />COMMENTS <br />Vol change cc: <br />Test 2: Start time: <br />COMMENTS <br />Bottom to top fill in inches: <br />127.0 <br />Bottom to grade in inches: <br />135.0 <br />Fill pipe length in inches: <br />35.0 <br />Fill pipe diameter in inches: <br />4.0 <br />Stage I vapor recovery: <br />DUAL <br />Stage II vapor recovery: <br />BALANCE <br />New/passed Failed/replaced New/passed Failed/replaced <br />L.D. #1 L.D. #1 L.D. #2 L.D. #2 <br />VAPORLESS <br />LD2000 <br />04201 <br />3.00 <br />21 <br />310 <br />189.0 <br />10 <br />3.00 <br />PASS <br />Test time: <br />12:25-13:16 <br />Material: <br />DW FIBERG <br />Ullage volume: <br />2260 <br />Diameter (in): <br />2.0 <br />Ullage pressure: <br />2.30 <br />Length (ft): <br />45.0 <br />Results: <br />PASS <br />Test psi: <br />50 <br />Bleedback cc: <br />90 <br />Test time (min): <br />30 <br />DATA FOR UTS-4T ONLY: <br />Test 1: Start time: <br />10:35 <br />Time of test 1: <br />12:44-12:54 <br />Finish psi: <br />48 NOT NOT <br />Temperature: <br />71.50 <br />Vol change cc: <br />Test 2: Start time: <br />13 TESTED TESTED <br />Flow rate (cfh): <br />0.200- <br />Finish psi: <br />10:45 <br />50 <br />Time of test 2: <br />12:55-13:05 <br />Vol change cc: <br />0 <br />Temperature: <br />71.50 <br />Test 3: Start time: <br />Finish psi: <br />10:55 <br />50 <br />Flow rate (cfh): <br />0.200- <br />Vol change cc: <br />0 <br />Time of test 3: <br />13:06-13:16 <br />Final gph: <br />0.007 <br />Temperature: <br />71.40 <br />Result: <br />PASS <br />Flow rate (cfh): <br />0.200- <br />Pump type: <br />PRESSURE <br />Pump make: <br />FE PETRO <br />COMMENTS <br />Impact Valves Operational: YES <br />NOT <br />TESTED <br />Draft 11/09/1998 11:40 MSHAW <br />NOT <br />TESTED <br />