My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1984-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
505
>
2300 - Underground Storage Tank Program
>
PR0231442
>
COMPLIANCE INFO_1984-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 4:49:19 PM
Creation date
6/3/2020 9:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1984-2002
RECORD_ID
PR0231442
PE
2361
FACILITY_ID
FA0006441
FACILITY_NAME
QUIK STOP MARKET #5124*
STREET_NUMBER
505
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
217-260-21
CURRENT_STATUS
01
SITE_LOCATION
505 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231442_505 N MAIN_1984-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEMS <br />As required by 23 CCR, Div. 3, Chapter 16, Art. 3, 2632(d)(2) <br />Upon recognition of a suspected unauthorized release from the primary containment or a <br />breach in the secondary containment, store personnel will notify the Quik Stop Director <br />of Environmental Affairs, Mike Karvelot, at (510) 657-8500. <br />2. The Director of Environmental Affairs will arrange for a qualified contractor to verify the <br />suspected breach of primary or secondary containment and/or verify proper operation of <br />the monitoring system. <br />3. Upon confirming the loss of tank system integrity, the tank system will be taken out of <br />service and product will be removed from the primary container. <br />4. The Director of Environmental Affairs will authorize all work necessary under this plan. <br />Representatives of the tank manufacturer will conduct an inspection of the leaking tank <br />to determine if repairable. Regulatory Agency(ies) will be notified. <br />5. All repairs to the failed tank will be completed pursuant to the requirements of 23 CCR, <br />Section 2661, under the direct supervision of the tank manufacturer. <br />6. Upon completion of repairs, the tank and product line will be precision tested in <br />accordance with the above regulation. The tank manufacturer will recertify the tank for <br />its intended use prior to bringing the tank back into service. <br />7. Unauthorized releases to the interstitial space between primary and secondary contain- <br />ment will be removed in accordance with procedures specified by the tank manufacturer. <br />The equipment required to accomplish this task will be designated and provided <br />pursuant to the tank manufacturer's recommendation. <br />8. All hazardous materials and contaminated waste generated by the repair activities will <br />be properly handled, transported, and disposed of in accordance with all appropriate <br />State and Local Regulations. <br />9. The interstitial monitoring system will be activated and recertified prior to bou ging the <br />UST system back into service. <br />Questions regarding this response plan should be directed to Mike Karvelot, Director of Environ- <br />mental Affairs, at (510) 657-8500. <br />Written Response Plan Double wall Tanks.wpd <br />MDK 10/25/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.